NOTE
Tighten to the correct torque! See the tightening
torques table at the end of the manual!
Figure 98. Cables ready
4.1.2 Installing the cables in the RLC unit
RLC unit cable compartment
Open the RLC cable compartment.
Figure 99. Cable compartment
1) Unscrew at the top of the RLC front cover, lift it
and remove the front RLC cover.
Figure 100. RLC front cover
2) Unscrew the top and back part of the RLC side
cover, lift it and remove the RLC side cover.
3) Unscrew, lift and remove the two metal
sheets.
Figure 101. RLC cover