D I S T R I B U T I O N S O LU T I O N S
3.3.3 Medium voltage cable locations and lengths
The medium voltage cable lengths (distance of the
cable connection point from the floor) depend on
the units and accessories used.
RLC unit
Medium voltage cable lengths and locations
Details
SDC
Basic
With CT
SDM
Basic
SDD
Basic
SFC
292 mm fuse
442 mm fuse
SBC/
Basic
With CT
SBC-W
DRC
Basic
With CT
SBR
Basic
UMP
With CT
HBC
Basic
With CT
With sensor
Kevcr
RLC/RRC H1700
Basic
With SBR
With HBC
RLC/RRC H2000
Basic
WBC/BME
Baseplate or
with CT
(1) With optional cable terminal
(2) Distance between side wall of panel and first connection cable
(3) Central phase (L2)
190 mm width
375 mm width
A (mm)
B (mm)
A (mm)
920
600
450
870
1520
265
1495
310
1435
280
1645
305
The following figures and table show the cable
lengths and locations for the different units.
500 mm width
B (mm)
A (mm)
B (mm)
210
920
275
530
275
200
600
240
200
450
240
180
670
240
530
275
608
275
460
325
583/450
(3)
275
600 mm width
750 mm width
A (mm)
B (mm)
A (mm)
530
525
(1)
920
570
570
610
500
400
550
600
150
600
(2)
21
B (mm)
265
275
(1)
210
400
400
355
340
390
270
165
(2)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents