Install near appropriate AC outlets, and Ethernet hubs or individual jacks. Be sure to install an AC Power Disconnect for the entire rack assembly. The Power Disconnect must be clearly marked. Ground the rack assembly properly to avoid electrical shock. NetSpective Web Filter • 16Hi Hardware Installation Guide Page 3...
• Repeat these steps for the other side of the rack.* right sides for proper alignment for appliance installation. NetSpective Web Filter • 16Hi Hardware Installation Guide Page 6...
Two 10-32 x 3/4” Fixed chassis rail order to release it from the rack. Carefully slide it out supporting the unit on both sides at all times. NetSpective Web Filter • 16Hi Hardware Installation Guide Page 7...
Outside front view • A pair of 2‐post rack assemblies that attach directly to the rack 2 Post Rack rail assembly, inside view 2 Post Rack rail assembly, outside view NetSpective Web Filter • 16Hi Hardware Installation Guide Page 8...
Tighten each of the single screws on the small fixed brackets (located on either side of the rack) to secure the brackets in the rack and ensure appliance stability. NetSpective Web Filter • 16Hi Hardware Installation Guide Page 9...
Network Interface Connection (NIC) #1 Quick Assist Accelerator Card Network Interface Connection (NIC) #2 Power Good LED #1 VGA Port Power Supply Lock #1 10G Ethernet Dual Port Fiber LC, PCIe 2.0 x8 NetSpective Web Filter • 16Hi Hardware Installation Guide Page 11...
Page 12
OCP, OVP, fan fail In normal operation the Power Good LED on Power Supply Module 1 and Module 2 will be SOLID GREEN. If the power is down, both LEDs will BLINK GREEN. NetSpective Web Filter • 16Hi Hardware Installation Guide Page 12...
Press the power button located on the Blue LED Red LED far right on the front side of the appliance. Once the system has been powered on, replace the bezel. NetSpective Web Filter • 16Hi Hardware Installation Guide Page 13...