Stand-Off Positioning - Nelson PLT-BC Installation Instructions Manual

Heat tracing systems standard power connection kit
Table of Contents

Advertisement

NELSON
HEAT TRACING SYSTEMS
PLT-BC
STANDARD POWER CONNECTION KIT

STAND-OFF POSITIONING

Section View A A
(recommend installing at the
4 or 8 o'clock positions.)
8 o'clock
Fiberglass Tape
not included in kit
Mark pipe where stand-off will be mounted. See drawing above.
Push heater cable through bottom opening of stand-off.
Place stand-off on pipe and fasten with pipe clamps included.
Slide the sealing grommet over the heater cable and position inside stand-off opening:
For Braided "CB" Products only:
See "Sealing Grommet Installation for Braided "CB" Products" on sheet 3.
Apply silicone around the heater cable on top of the sealing grommet and fill any voids in sealing grommet.
Slide the box adapter over the heater cable and tighten securely to stand-off.
Prepare heater cable for power termination:
for Braided "CB" Products, see sheet 3.
for Overjacket "J" or "JT" Products, see sheet 4.
Terminate heater cable, see sheet 7.
P.O. BOX 726
TULSA, OK 74101
GA-1859 Rev. 6
Sheet 2 of 8
October 2006
4 o'clock
A
254mm (10")
A
Stand-off
TEL 918-627-5530
Do not place pipe clamps
over the heater cable.
Pipe Clamps
Fiberglass Tape
not included in kit
FAX 918-641-7336
www.nelsonheaters.com
INSTALLATION
INSTRUCTIONS
!
WARNING:
Stand-off
Sealing Grommet
Box Adapter