Initial Power-Up - GE PACSystems RX3i IC695ACC403 Quick Start Manual

Rackless energy pack
Table of Contents

Advertisement

5 Initial Power-up

When 24Vdc power is first applied to the Energy Pack,
the power-up process goes through the following steps:
The IN LED turns on green.
1.
The Energy Pack performs a self-diagnostic
2.
test. If this test passes, output power to the
Controller is turned on and the OUT LED turns
on green.
Charging of the CapPack begins and the STAT
3.
LED blinks green.
When charging of the CapPack is complete, the
4.
STAT LED turns on solid green and the Energy
Pack signals to the controller that it can start
run-time operation. The Controller will not start
running its application until the Energy Pack
signals that it is fully charged.
Figure 6: LEDs on CAP Pack
GFK-3000A
IC695ACC403 Quick Start Guide
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gfk-3000a

Table of Contents