Chen Hsong Ai-02 Operation Manual page 88

Injection multi-function computer
Table of Contents

Advertisement

Presetting — manually adjust initial point position
(3) Manually adjust initial point position of mould clamping method
Before manually adjust initial point, please check the following setting
values:
(i)
Initial
point
61),speed=50%,pressure=99%
(ii) Initial point reset time, TIM20=4 seconds
(iii) Check presetting position is DD=1P
Note:(i)
(ii)
Method : press key to move the mould clamping machine toggle, after 4
seconds running of Timer TIM20, and the toggle completely
straightens, the actual mould clamping position is automatically
changed to preset position with setting value of IP. Initial point setting
of manual mould clamping is completed.
completely straightened, it is required to manually set the initial point
of mould clamping.
While the machine is operating, if the initial point changes, the
right initial point position can be relocated by manually
adjusting initial point.
speed
and
No product is in the mould. If available, firstly take the product
out.
Mold is equipped with core pulling and core rotating devices,
and check position stroke, to ensue the core pulling and core
rotating devices installed on the safe and right position, to
avoid damage.
If the after 4 seconds running of Timer TIM20,the toggle has not
pressure
setting
(initialization
interface

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Chen Hsong Ai-02

Table of Contents