GRAND RESORT Venetia Owner's Manual

10 inch x 12 inch hardtop gazebo

Advertisement

Owner's Manual
Venetia 10' x 12'
Hardtop Gazebo
Sojag Code: 999-3136463
Product Code: D71 M80921
UPC Code: 772830136463
Date of purchase: _____ /_____ /_____

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Venetia and is the answer not in the manual?

Questions and answers

DAVID HUISMAN
May 4, 2025

replacement panels for code: 999-3136463

Subscribe to Our Youtube Channel

Summary of Contents for GRAND RESORT Venetia

  • Page 1 Owner’s Manual Venetia 10’ x 12’ Hardtop Gazebo • Sojag Code: 999-3136463 Product Code: D71 M80921 UPC Code: 772830136463 Date of purchase: _____ /_____ /_____...
  • Page 2: Table Of Contents

    Table of ConTenTs Safety Information ........2 Pre-installation ..........4 Warranty ............3 Planning Installation ......4 Tools required ........4 What is Covered ........3 Hardware Included ........5 What is Not Covered ......3 Package contents .........6 Operation ............3 Installation ..........7-23 Maintenance ..........3 Care and Cleaning ........3 safeTy InformaTIon WarnInG: KEEP ALL FLAME AND HEAT SOURCES AWAY FROM THIS TENT FABRIC.
  • Page 3: Warranty

    WarranTy WHAT IS COVERED The Venetia sunshelter is guaranteed against defective materials based on normal use of the product as follows: 3 years on the frame and it’s finish, 2 years on the roof panels. Limited warranty applicable on parts only. WHAT IS NOT COVERED Damages due to vandalism, abuse or wrong use of the product. Damages due to extreme weather conditions such as a thunderstorm, windstorm and hailstorm. Rust, water infiltration, holes in polycarbonate roof panels, fabric and...
  • Page 4: Pre-Installation

    pre-InsTallaTIon ImporTanT: Do not remove the protective film on the polycarbonate roof panels before installation (step 14 and 16). Make sure to put the UV protected side facing the sun. It is a very important procedure; if not followed as described, your roof will not be covered by the warranty.
  • Page 5: Hardware Included

    HardWare KIT noTe: Parts not shown to actual size and not to scale. Item description M6 x 20 Screws M6 x 35 Screws M6 x 16 Screws St5 x 15 Screws M5 x 15 Screws Allen Key...
  • Page 6: Package Contents

    parTs lIsT noTe: Parts not shown to actual size and not to scale. part description part description part description Column Finishing Roof Side Structure L Joint Cover Plate (middle) Short Ogee G Left Roof Side Structure Ma Left Roof Panel (upper) Short Ogee Right Roof Side Structure Mb Left Roof Panel (lower)
  • Page 7: Installation

    installation ImporTanT: Always install the sun shelter on a level platform, wood or concrete. step 1 1.1 Install Column (A) on Base (H) using Screws (W1). Repeat for all four Column (A). Parts required for this step:...
  • Page 8 installation noTe: Only the two bottom screws are to be inserted for this step. step 2 2.1 Slide the Short Ogee (B) into the Short Ogee (B1). 2.2 Slide the Long Ogee (C) into the Long Ogee (C1). 2.3 Attach the Short Ogee (B) to the Short Ogee (B1) using Srews (V). 2.4 Attach the Long Ogee (C) to the Long Ogee (C1) using Srews (V). Repeat for all Ogees. Parts required for this step:...
  • Page 9 installation step 3 step 4 3.1 Insert 6 Hooks (X) into Short Track (B2). 4.1 Install Long Track (C2) into Long Ogee (C) using Screws (V). 3.2 Insert 6 Hooks (X) into Short Track (B3). 4.2 Install Long Track (C3) into Long Ogee (C1) using Screws (V). 3.3 Insert 7 Hooks (X) into Long Track (C2). 4.3 Install Short Track (B2) into Short Ogee (B) using Screws (V). 3.4 Insert 7 Hooks (X) into Long Track (C3). 4.4 Install Short Track (B3) into Short Ogee (B1) Repeat this step twice. using Screws (V). Repeat this step twice. Parts required for this step:...
  • Page 10 installation CaUTIon: 3 people are required for this step. step 5 5.1 Install the Ogees (C & C1) between 2 Columns (A). Use Screws (T) on the outside of the ogee and Screws (U) on the inside of the ogee. Finish the installation of the long ogees (C and C1) using Screws (V) from the inside of each column (A) as illustrated. 5.2 Install the Ogees (B & B1) between 2 Columns (A). Use Screws (T) on the outside of the ogee and Screws (U) on the inside of the ogee. Finish the installation of the short ogees (B and B1) using Screws (V) from the inside of each column (A) as illustrated. Repeat this step twice. Parts required for this step:...
  • Page 11 installation step 6 6.1 Install the Joint Cover Plates (L) using Screws (W) on the joint between the ogees (B & B1) and (C & C1). 6.2 Install the Corner Cover (I) using Screws (W) on each corner of the structure. Repeat this step 4 times. Parts required for this step:...
  • Page 12 installation step 7 7.1 Install Solidifying Bar (K2) between ogees and fix in place using Screws (V) in order to form a triangle. 7.2 Install Solidifying Bars (K & K1) inside each structure bar and join the other end to the column using Screws (V). Repeat this step for each four corner. Parts required for this step:...
  • Page 13 installation step 8 8.1 Fix the Roof Side Structure (G, G1 & G2) on the Ogees (C & C1) using Screws (W). 8.2 Fix the Roof Side Structure (G & G1) on the Ogees (B & B1) using Screws (W). Repeat this step twice. Parts required for this step:...
  • Page 14 installation noTe: Do not screw the column cap (I1) before step 11. step 9 9.1 Install Column Cap (I1) on top of Column (A). Repeat this step 4 times. step 10 10.1 Install Corner Roof Bars (D) to the Inside Roof Connector (S1) using Screws (V). Repeat this step 4 times. Parts required for this step:...
  • Page 15 installation step 11 11.1 Place roof structure on top of ogees. 11.2 Screw Corner Roof Bar to the column using Screw (V). Repeat this step 4 times. Parts required for this step:...
  • Page 16 installation step 12 12.1 Install Roof Bars (E) to the Inside Roof Connector (S1) using Screws (V). 12.2 Screw Roof Bars (E) to the Ogees (B, B1,C & C1) using Screws (V). Repeat this step 6 times. Parts required for this step:...
  • Page 17 installation step 13 13.1 Install the Outside Roof Connector (S) to the Inside Roof Connector (S1) using Screws (V). Parts required for this step:...
  • Page 18 installation CaUTIon: noTe: One side of the roof panels is UV protected. Make sure to put the UV The roof panels are covered with a plastic film identifying which side protected side facing the sun. It is a very important procedure; if not has a UV protector.
  • Page 19 installation step 15 15.1 Install the Roof Support Bars (J, J1 & J2) according to picture. Make sure they are completely inserted in the tracks. 15.2 Align Middle Roof Support Bar (J2) with Roof Support Bar (J & J1). CaUTIon: J, J1 & J2 Ensure that the roof panels are completly inserted into the roof support bars (J, J1 and J2). D & E Parts required for this step:...
  • Page 20 installation CaUTIon: noTe: One side of the roof panels is UV protected. Make sure to put the UV The roof panels are covered with a plastic film identifying which side protected side facing the sun. It is a very important procedure; if not has a UV protector.
  • Page 21 installation CaUTIon: 2 people are required for this step. step 17 17.1 Secure the left side of a Finishing Roof Side Structure (F) with Screw (V) in the left corner of the 12 foot side of the unit. This screw (V) will be undone and re-inserted at the end of step 17 in order to finish the unit with a Corner Finishing End (Q). 17.2 Place a roof Middle Roof Side Structure (F2) next to the Finishing Roof Side Structure (F) and align the pre-drilled holes in each bar one on top of the other. Place Finishing End (R) over the aligned holes and secure with Screw (V). 17.3 Repeat this step with Finishing Roof Side Structure (F1) by securing it to Middle Roof Side Structure (F2) with Finishing End (R) and Screw (V). 17.4 In order to transition from the 12 foot side of the unit to the 10 foot side, align the remaining pre-drilled hole of Finishing Roof Side Structure (F1) with that of a Finishing Roof Side Structure (F) on the 10 foot in the corner of the unit.
  • Page 22 installation CaUTIon: noTe: 2 people are required for this step. The 10 foot sides of the unit do not require having Finishing Roof Side Structure (F2) installed on them. step 17 (continued) 17.5 Secure a Finishing Roof Side Structure Bar (F1) to Finishing Roof Side Structure (F) on the 10 foot side with Corner Finishing End (R) and Screw (V). 17.6 Repeat working your way around the entire unit until coming to the last corner where the installation of the Finishing Roof Side Structures began.
  • Page 23 installation step 18 noTe: 18.1 Install the Mosquito Netting (P) along the tracks by The netting should be installed starting in the middle of the 12 foot side of the unit, wrap around the inside of the post, and finish the inserting the Hooks (X) one at a time into the eyelets installation in the middle of the 10 foot side of the unit. The zippers found along the top border of the netting.
  • Page 24 Please refer to part numbers when reordering For questions or comments about product: Email: piece@sojag.ca or Call toll-free: 1-866-901-1649 Made in CHINA Distributed by Sears, Roebuck and Co., Hoffman Estates, IL 60179 See our extensive assortment of outdoor living products on-line at www.sears.com and www.kmart.com...

Table of Contents

Save PDF