Optional Gas Heat; Gas Application Data; Gas Pipe Sizing - Capacity Of Pipe; Gas Heat Minimum Supply Air Imperial - York ZF180 Installation Manual

Zf series
Hide thumbs Also See for ZF180:
Table of Contents

Advertisement

5168276-XIM-B-0216

Optional Gas Heat

These gas-fired heaters have aluminized-steel or optional
stainless steel, tubular heat exchangers with spark ignition with
proven pilot.
Table 11: Gas Application Data
Unit
Input
Size
Opt.
(MBH)
N30
180
N40
N30
240
N40
Gas Piping
Proper sizing of gas piping depends on the cubic feet per hour
of gas flow required, specific gravity of the gas and the length of
run. "National Fuel Gas Code" Z223.1 (in U.S.A.) or the current
Gas Installation Codes CSA-B149.1 (in Canada) should be
followed in all cases unless superseded by local codes or gas
utility requirements. Refer to the Pipe Sizing Table 13. The
heating value of the gas may differ with locality. The value
should be checked with the local gas utility.
NOTE: There may be a local gas utility requirement specifying
a minimum diameter for gas piping. All units require a
one-inch pipe connection at the entrance fitting.
Main
Manual
Shut-off
Valve
Figure 16: External Supply Connection External Shut-Off
Figure 17: Bottom Supply Connection External Shut-Off
20
Temp Rise
Output (MBH)
300
240
400
320
300
240
400
320
Drip Leg
Main
Manual
Shut-off
Valve
Drip Leg
Table 12: Gas Pipe Sizing - Capacity of Pipe
Length of
Pipe ft. (m)
10 (3)
20 (6)
30 (9.1)
40 (12.1)
(°F)
20-50
50 (15.2)
30-60
60 (18.2)
20-50
30-60
70 (21.3)
80 (24.3)
90 (27.4)
100 (30.4)
NOTE: Maximum capacity of pipe in cubic feet of gas per hour
based upon a pressure drop of 0.3 inch W.C. and 0.6
specific gravity gas.
Table 13: Gas Heat Minimum Supply Air Imperial
Size
(Tons)
180
(15)
240
(20)
Table 14: Gas Heat Minimum Supply Air Metric
Size
(Tons)
180
(15)
240
(20)
Gas Connection
The gas supply line can be routed within the space and roof curb,
exiting through the unit's basepan. Refer to Figure 5 for the gas
piping inlet location. Typical supply piping arrangements are
shown in Figures 16 and 17. All pipe nipples, fittings, and the gas
cock are field supplied.
Gas piping recommendations:
1.
A drip leg and a ground joint union must be installed in the
gas piping.
2.
Where required by local codes, a manual shut-off valve
must be installed outside of the unit.
3.
Use wrought iron or steel pipe for all gas lines. Pipe dope
should be applied sparingly to male threads only.
Nominal Iron Pipe Size
1 in.
1-1/4 in.
520 (14.7)
1050 (29.7)
350 (9.9)
730 (20.6)
285 (8)
590 (16.7)
245 (6.9)
500 (14.1)
215 (6)
440 (12.4)
195 (5.5)
400 (12.4)
180 (5)
370 (10.4)
170 (4.8)
350 (9.9)
160 (4.5)
320 (9)
150 (4.2)
305 (8.6)
Supply Air (CFM)
Heat Size
Cooling
Min
Max
N30
4500
7000
N40
4500
7000
N30
6000
9400
N40
6000
9400
Supply Air (M
Heat Size
Cooling
Min
Max
N30
2.13
3.3
N40
2.13
3.3
N30
2.83
4.44
N40
2.83
4.44
Johnson Controls Unitary Products
Heating
Min
Max
4500
7000
4500
7000
6000
9400
6000
9400
3
/S)
Heating
Min
Max
2.13
3.3
2.13
3.3
2.83
4.44
2.83
4.44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zf240

Table of Contents