Download Print this page

Skyjacker FJ730K Installation Instructions

07-10 toyota fj cruiser 2.5"- 3” platinum series coil over

Advertisement

Quick Links

www.skyjacker.com
Part #
Description
TOY20153-S
2.5-3" COIL-2" COIL
SKY201-S
SKYJACKER 2" SHOCK
T5USM-B
UPPER SHOCK MOUNT
T5SBB-S
Sway Bar lowering block
FJ25R
2.5" REAR COILS FJ
SBE702
END LINKS REAR
-Skyjacker strongly advises taking extreme caution when working with loaded coil springs to
prevent accident or harm.
-Trucks w/o manual locking hubs, the height must not be adjusted over 2" above OEM height.
-Both coil over assemblies should be adjusted to the same length (19 7/8" center to center)
after installation. It is VERY IMPORTANT that after installation, the coil does not have any
slack between the mounting cups. At no time during axle travel should the coils loose
contact with the mounting points.
-When final adjustments are made, the set screw MUST be tightened. At no time should the
coil over assembly be ran without the set screw being tight.
Front Installation:
1. With the vehicle on flat level ground, measure from center of the
front spindle to the top of the fender opening. Record this
measurement for later use.
2. Raise the front of the vehicle in the center of the front cross member,
using a floor jack.
3. Support the vehicle on the frame cross member so that the front tires
/ wheels are off the ground & remove the front tires / wheels.
4. Remove the ABS line from the upper A-arms using a 10mm wrench.
(See Photo # 1) Disconnect ABS / brake line from the steering
knuckle.
5. Remove the sway bar end links using 17mm. (See Arrow in Photo
# 2)
6. Remove the cotter pin from the outer tie rod & disconnect tie rod
using a 12 mm socket. (See Photo # 3)
I-FJ730 REV1 6-10
07-10 Toyota FJ Cruiser 2.5"- 3"
Platinum Series Coil Over
Qty
2
2
2
2
1
1
IMPORTANT NOTES

Installation Instructions

Part # FJ730K
Photo # 1
Photo # 2
Photo # 3
Pg 1

Advertisement

loading

Summary of Contents for Skyjacker FJ730K

  • Page 1: Installation Instructions

    SBE702 END LINKS REAR IMPORTANT NOTES -Skyjacker strongly advises taking extreme caution when working with loaded coil springs to prevent accident or harm. -Trucks w/o manual locking hubs, the height must not be adjusted over 2" above OEM height. -Both coil over assemblies should be adjusted to the same length (19 7/8" center to center) after installation.
  • Page 2 10. Disconnect the front sway bar from the frame & install the new Skyjacker lowering blocks. 11. Assemble the new Skyjacker coil over. (See Photo # 7) Attach the new coil over to the new Skyjacker upper mounting bracket using the 1/2"...
  • Page 3 18. Remove the OEM rear coil springs & replace with the new Skyjacker rear coil springs. Be sure to retain the OEM upper bump stop. (See Photo # 11) 19. Reattach the track bar & brakelines. Install the new Skyjacker sway bar end links using the supplied bushings &...