Pht-F/T Unit - Float Valve Adjustment - Grundfos PHT-N130 Installation And Operating Instructions Manual

Pht-n series; pht-d series; pht-f series; pht-t series; pht-v series pressurisation unit
Table of Contents

Advertisement

8.2 PHT-F/T unit – Float valve adjustment.
Fig. 10 PHT-F/T – Float valve level adjustment
8.3 Priming of the Pumps and System.
All PHT-D/F/T/V pumps must be primed before the PHT unit is switched ON.
Permanent damage can occur from dry running the pumps.
To Prime:
 Loosen the priming screw(s) located on the pump housing, system manifold(s) until water
flows through the priming screw.
 Tighten the priming screw back up.
 Dry off any water.
Fig. 11 – PHT-*25 and PHT-*50 Models
Fig. 13 System priming
www.grundfos.co.uk
GRUNDFOS INSTRUCTIONS
Set the ball float valve to its lowest
position on the valve arm.
Allow the tank to fill from the mains
water supply and check that the stop fill
level does not exceed the Overflow and
sit just below the Overflow.
Adjust as necessary.
Priming Screws
Locations
Fig. 12 – PHT-*80 Model
Page 22 of 47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents