Initial Setting For Air-To-Water Unit - Panasonic S-80MW1E5 Installation Instructions Manual

Air-to-water heatpump for refrigerant r410a
Table of Contents

Advertisement

7-3. Initial Setting for Air-to-Water Unit

START
7-3-1.
Mode Select
RESTART
7-3-2.
Test Run for Water Circuit
• Air purge
7-3-2.
Test Run for Water Circuit
• Pump Speed Setup
FINISH
7-3-1. Mode Select
High-spec Wired Remote Controller (CZ-RTC5)
I When switching on the power for the first time after
installation, it is necessary to make the initial setting for the
Air-to-Water unit.
Press the
or
and press the
button to finish this process.
After confirmation, the system restarts automatically.
button to select "TANK" or "A/C"
* To complete the initial setting, it is necessary to carry out the
Test Run for Water Circuit.
* If the Test Run for Water Circuit is not complete, "L16" alarm
will occur.
7-3-2. Test Run for Water Circuit
* You cannot perform the test run of refrigerant circuit if test run
for water circuit has not been completed.
* First, pour water into the water circuit.
High-spec Wired Remote Controller (CZ-RTC5)
1. Keep pressing the
simultaneously for 4 or more seconds.
The "Maintenance func" screen appears on the LCD display.
2. Press the
you wish to see the next screen instantly, press the
or
button.
Select "13. Air-to-Water unit" on the LCD display and press
the
button.
20
,
and
or
button to see each menu. If
buttons

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-125mw1e5

Table of Contents