Quick installation guide
• Installing the machine
I
• Operation
II
①
②
⑰
⑯
⑮
⑭
⑬
• Water supply
⑤
• Internal cleaning
III
③
④
⑫
(H
O-Temp. = max. 30°C)
2
(H
O-Pressure = max 4 bar)
2
Rühle GmbH, Beim Signauer Schachen 10, D-79865 Grafenhausen
Tel.: +49 7748-523-11, Fax: +49 7748-523-8511
www.original-ruehle.de
⑪
⑩
⑨ ⑧ ⑦ ⑥
②
•Emergency stop button
⑤
1)
Cover
2)
Emergency button
3)
Operating panel
4)
Fork lifting device
5)
Water supply
6)
Power supply cable
7)
Cable protection
8)
Side panel
9)
Main switch
10) Type plate
11) Lifting device
12) Door internal brine
chamber
13) Lifting device button
14) Brine mixer / Brine
suction
15) Ultrasonic sensor
16) Access protection
(outlet)
17) Access protection(inlet)
• Main switch
⑨
Need help?
Do you have a question about the IR 56 and is the answer not in the manual?
Questions and answers