Wiring Connections In The Control Box - Mitsubishi Electric City Multi PUHY-P200YNW-A Installation Manual

Air-condtioners for building applications inverter y-series puhy-p-ynw-a(-bs) puhy-ep-ynw-a(-bs) for use with r410a
Table of Contents

Advertisement

10-5. Wiring connections in the control box

Connections must be made securely and without tension on the terminals.
- Improperly connected cables may break, overheat, or cause smoke or fire.
10-5-1. Threading power cable through the knockout hole
・Open the front panel when performing wiring work.
・Punch out the knockout holes at the bottom of the front panel or base with a hammer. Use the appropriate knockout
hole according to the size of the power cable, referring to the table below.
(1) When routing the wiring through the front of the unit
Power cable size (mm
2
2, 3.5, 5.5
8, 14
21, 26, 33
84, 67, 53
Cable strap
Power cable
Transmission cable
The length of the section after the cable access hole must be at least 1100 mm (43 in).
Clamp
Ground wire that connects Main Box and Inverter Box
KJ79F137H01
)
Knockout hole to be used
Knockout hole 2
Knockout hole 4
Knockout hole 3
Knockout hole 5
(2) When routing the wiring through the bottom of the unit
GB-46
Fill the gap.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents