Yetter 6300 Operator's Manual page 19

Coulter cart
Table of Contents

Advertisement

ATTACHING IMPLEMENT
WARNING:
operating. Failure to heed may result in personal injury or death.
WARNING:
may result in personal injury or death.
The Yetter coulter cart is designed for use with 3 point mounted grain drills, planters and other integral / mounted
implements.
The implement must be equipped with a category II or III spreader bar with category II spread or the implement must
have a category II hitch.
STEP 1. Carefully back the Yetter cart to the implement. Raise or lower the cart to align the hitch of the cart with the
pins of the implement.
STEP 2. Secure the hitch locks with the 6300-102 pins and 7 ga. hairpins. Connect the adjustable top link of the cart
to the lower hole in the center anchor of the implement. Lock the jam nut when the leveling adjustments are
completed.
Proper operation of the implement requires the frame to be level from front to rear as well as side-to-side. Refer to
the manufactures of the implement's operation manual for more instructions. During field operation, the toolbar frame
height must be controlled by the position of the drive/gauge wheels of the drill. Always fully lower the cart and retract
the lift wheels when seeding/planting.
IMPORTANT: Check clearance of the implement and the cart transport tires. A quick hitch may be required
when using certain implements to space implement from tires.
IMPORTANT: Yetter carts used with subsoilers/rippers are not to be used where rocks or other obstructions
are present and are subject to the following limitations; subsoiler no larger than 5 shanks, tractor not to
exceed 280 flywheel horsepower.
OPERATION
Be sure the attached implement is securely locked in the hitch of the cart before
Always install the transport lock pins when transporting at any time. Failure to heed
19

Advertisement

Table of Contents
loading

Table of Contents