About This Document - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

RRU3260
Installation Guide
Purpose
This document describes the process of installing a DC blade RU3260 (referred to as RU in
this document).
Product Versions
The following table lists the product versions related to this document.
Product Name
DBS3900
Intended Audience
This document is intended for:
Base station installation engineers
Organization
1 Changes in the RU3260 Installation Guide
This chapter describes the changes in the RU3260 Installation Guide.
2 Installation Preparations
This chapter describes the reference documents, tools, and instruments that must be ready
before the installation. In addition, it specifies the skills and prerequisites that installation
engineers must have.
3 Information About the Installation
Before installing an RU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.
Issue 05 (2014-06-30)
Solution Version
SRAN6.0 and later versions
eRAN2.1 and later versions
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

About This Document

Product Version
V100R004C00 and later
versions
V100R003C00 and later
versions
About This Document
ii