Heat-N-Glo ATS-AUST Installation And Operation Instruction Manual page 11

Australian gas association approved
Table of Contents

Advertisement

1
Step 1. Place Log Number 1 back against the air intake passage in the back of the box. Slide the log left
until it contacts the metal bracket protruding on the left side of the air intake. Drive a wood
screw through the hole in this bracket and into the log to positively locate.
Step 2. Place Log Number 2 with the flat side facing the rear on the left side of the grate. Push the right
side of the log back so it rests against the tab on the grate. Position the log so it rests against
the log bracket at the left side of the firebox. Drive a wood screw through this bracket and into
log number 2.
Step 3. Place Log Number 3 with it's flat side down between the rear log and the front of the grate, on
the right side. Position the log so it rests against the log bracket at the right side of the firebox
and the tab on the fourth bar of the grate. Secure this log with another screw.
Step 4. Place Log Number 4 with its bottom in front of the third and fourth bars of the grate. Position the
split end of the log on the top of the rear left side. The inside fork should rest against the rear log
location bracket. Tie this log to the rear log with a screw at the location marked "X".
LOG PLACEMENT INSTRUCTIONS
2
10
3
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents