Download Print this page

Advertisement

Quick Links

ASSEMBLY INSTRUCTIONS

T140 / T220/ T300
www.softub.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the T140 and is the answer not in the manual?

Questions and answers

Summary of Contents for Softub T140

  • Page 1: Assembly Instructions

    ASSEMBLY INSTRUCTIONS T140 / T220/ T300 www.softub.com...
  • Page 2 Roll up your sleeves and set up the Softub! Do not use a razor knife to open the box. Use the claw end of a hammer to tear the flaps open. www.softub.com...
  • Page 3 These are the items you received and will need. Please note that the filter is probably already Place the straps for the cover on the ground in an “X” pattern. The back installed in the tub. Please leave it installed on side of the buckle should be facing up so the buckle attaches properly the wall of the tub.
  • Page 4 Twist the connectors on a clock-wise fashion until the connectors are snug and no threads are showing. Connect the light connector. Verify the placement of the straps under the tub. You can dry-fit the cover at this point in time to make sure the straps are installed correctly. Line up the connectors on the power unit with the connectors on the tub.
  • Page 5 Run the hose for 2 to 3 minutes in After filling the tub with about 2 inches the garden, yard or down a drain of water, smooth out any wrinkles on before beginning to fill the tub. This the bottom of the liner by moving the will help to clear out any algae or liner around with your hands and fingers.
  • Page 6 approx. 2 In. Check the tub connections for leaks. Simply tighten the Make sure the filter is connectors a little more if there is a leak. Plug the tub installed if not installed already. Soak filter in in now. warm water prior to installing to ease the installation.
  • Page 7 With the tub running check the chemical levels and adjust them as necessary as advised in the Water Care Guide. Open the air control on the control panel by rotating counter-clock- wise for 15 minutes after adding the chemicals. After 15 minutes, close the air control by rotating it counter-clockwise until it stops and put the lid on the tub.
  • Page 8 LIGHT HEAT FILTER JETS Set the tub to your desired temperature and make sure to lock your cover. Your tub is now heating and will shut off when the desired temperature is reached. The tub heats at 1 to 1.5 degrees per hour.
  • Page 9 www.softub.com...

This manual is also suitable for:

T220T300