Stihl RMI 632 P Instruction Manual page 27

Hide thumbs Also See for RMI 632 P:
Table of Contents

Advertisement

Available languages

Available languages

10 Installing the Robotic Mower
clearances and install restricted areas, reserve wire,
linking sections, secondary areas and corridors during
wire routing.
2
1
A
► Secure the perimeter wire (1) with a wire stake (2) on the
left side (A) or on the right side (B) of the docking station,
next to a wire outlet in the base plate.
► Leave a section of wire (1) with a length of approximately
a = 4.92 ft. (1.5 m). This segment will later be connected
to the docking station.
To install the perimeter wire around an internal docking
station:
► Install the perimeter wire (2) on the left side and on the
right side of the docking station (1) in a straight line with a
length of a = 23.6 in. (60 cm) and at right angles (90°) to
the base plate.
0478-131-3046-A
B
1
90
a
3
a
90
2
► If the "Passage" feature in the "Installation" settings is
activated (@ 15.3), this section of perimeter wire (a) must
be longer, at least a = 4.9 ft. (1.5 m).
To install the perimeter wire around an external docking
station:
1
A
► Secure the perimeter wire (1) with a wire stake (2) on the
left front side (A) or on the right front side (B) of the
docking station, next to a wire outlet in the base plate.
► Leave a section of wire (1) with a length of approximately
a = 6.56 ft. (2 m). This segment will later be connected to
the docking station.
3
► Install the perimeter wire (2) in front of and behind the
docking station (1) with a clearance of
a = 19.7 in. (50 cm) and at right angles (90°) to the base
plate.
► Install a corridor, leaving a minimum clearance of
b = 17.3 in. (44 cm) to the side of the base plate.
1
2
B
b
a
90
1
90
1
b
English
1
25

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents