System Charge For Various Matched Systems; Footnotes; Charging Procedures - Coleman TW4B2421S Technical Manual

Lx series split system air conditioners 14 seer – r-410a – 1 phase 1.5 thru 5 nominal tons
Table of Contents

Advertisement

5495495-CTG-A-0418

SYSTEM CHARGE FOR VARIOUS MATCHED SYSTEMS

Outdoor Unit
TW4B1821S
1,2
Required TXV
3,4,5
Indoor Unit
AP18B
AP24B
AP30B
AP36B
AP36C
AP42C
AP48(C,D)
AP60(C,D)
AE18B
AE24B
AE30B
AE36(B,C)
AE42C
AE48(C,D)
AE60C
AE60D
AVC18B
AVC24B
AVC30B
AVC36(B,C)
AVC42C
AVC48(C,D)
AVC60C
AVC60D
CF/CM/CU18(A,B)
CF/CM/CU24(A,B)
CF/CM/CU30(A,B,C)
CF/CM/CU36(A,B,C,D)
CF/CM/CU42(B,C,D)
CF/CM/CU48(C,D)
CF/CM/CU60(C,D)
CF/CM64D
Some of the combinations shown in the above System Charge table require Advanced Main Air Circulating Fan indoor product. For approved coil
only matches, please see the "COOLING CAPACITY - Upflow, Downflow & Horizontal Furnaces and Coils" table.

FOOTNOTES:

1. For applications requiring a TXV, use S1-1TVM*** series kit.
2. A TXV kit must be used with these indoor units to obtain system performance.
3. Systems matched with furnaces or air handlers not equipped with blower-off delays may require blower Time Delay Kit S1-2FD06700224.
4. CF coils cannot be used in horizontal applications.
5. Charge adders shown above do not indicate that coils are rated for every application. Refer to Performance Data Tables for actual performance for specified sys-
tem matches. Obtain certified system ratings from www.ahridirectory.org.

CHARGING PROCEDURES:

1. Check the Factory Unit Charge listed on the unit nameplate to verify the refrigerant charge for the outdoor unit, the smallest matched indoor unit, and the 15 feet
of interconnecting lineset.
2. Verify the indoor metering device and additional charge required for the specific matched indoor unit in the system using the above table.
3. Add additional charge for the amount of interconnecting lineset greater than 15 feet at the rate specified in the Physical and Electrical Table.
4. For installations requiring additional charge, weigh in refrigerant for the specific matching indoor unit and actual lineset length.
5. Once the charge adders for matched indoor unit and for lineset have been weighed in, verify the system operation against the temperatures and pressures in the
Charging Chart for the outdoor unit. Locate Charging Charts on the outdoor unit and also in the Service Data Application Guide on www.upgnet.com. Follow the
Subcool or the Superheat charging procedure in the Installation Manual according to the type of indoor metering device in the system, and allow ten minutes after
each charge adjustment for the system operation to stabilize. Record the charge adjustment made to match the Charging Chart.
6. Permanently stamp the unit data plate with the TOTAL SYSTEM CHARGE defined as follows: TOTAL SYSTEM CHARGE = Base Charge (as shipped) + charge
adder for matched indoor unit + charge adder for actual lineset length + charge adjustments to match the Charging Chart.
4
TW4B2421S
BA1
BA1
0
3
0
10
7
10
7
11
11
0
3
0
8
5
10
7
0
3
0
8
5
10
7
0
3
0
8
5
10
7
11
TW4B3021S
TW4B3621S
BB1
BC1
Additional Charge, oz
2
2
0
2
2
2
2
5
0
2
0
5
5
0
2
0
5
5
0
2
0
2
2
5
TW4B4221S
TW4B4821S
BC1
BC1
0
2
0
9
2
2
2
0
9
2
29
22
2
2
0
9
2
29
22
0
2
0
9
2
29
22
Johnson Controls Unitary Products
TW4B6021S
BD1
0
0
20
0
20
0
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents