Modification For Parallel Operation - Flex ROA 128 5068 User Manual

Pol sip evaluation board
Table of Contents

Advertisement

ROA 128 5068
POL SIP Evaluation Board
3

Modification for Parallel Operation

It is possible to operate two or three BMR 463 2002 or two or three BMR 464
2002 in parallel by connecting the output voltage connectors together.
For proper performance the connection shall be of low impedance and the
point of connection shall be at the PCB as indicated in Figure 3.1.
As connection power jumpers can be used as shown in Figure 3.2. Note that
the power jumpers shall be attached below the ring nuts of the output voltage
connectors. Alternatively the connection can be made of a piece of thick
copper wire that is soldered directly to the PCB.
BMR 464
Points of connection
Fig 3.1. Connection of output voltage for parallel operation.
Fig 3.2. Connection with power jumpers.
User Guide
1/28701-ROA 128 5068 Rev A
© Flex
BMR 463
12
May 2018

Advertisement

Table of Contents
loading

Table of Contents