4.5.3 Full Load Test
1. After the Off Center Load Test has been passed, test the Base's full capacity
according to the Specification Table 1-1. The Base must meet all specifications as
listed.
2. If the Base fails the Full Load Test, check and set the Down Stops.
(See Section 3.3.)
CKW Base Series Service Manual
4-5
Ohaus Corporation www.ohaus.com
CHAPTER 4 TESTING