4.5.3 Full Load Test - OHAUS Defender D30BR Service Manual

Defender bases - dry-use (b series) - wet-use (v series)
Hide thumbs Also See for Defender D30BR:
Table of Contents

Advertisement

4.5.3 Full Load Test

1. After the Off Center Load Test has been passed, test the Base's full capacity
according to the Specification Tables 1-1 through 1-6. The Base must meet all
specifications as listed.
2. If the Base fails the Full Load Test, check and set the Overload Stops.
(See Section 3.3.)
Defender™ B & V Series Service Manual
4-5
Ohaus Corporation www.ohaus.com
CHAPTER 4 TESTING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents