ABB SafeRing 36 Installation And Operating Instructions Manual page 20

Table of Contents

Advertisement

5. If a fuse-link is already installed but has to be
replaced, pull it out.
6. Fix the new fuse-link to the fuse cover by means
of the contact screw.
Note! the striker pin must point towards the fuse
cover.
7. Insert the fuse-link into fuse canister..
20 SafeRing/SafePlus 36kV | Installation and operating instruction
8. Press the handle and close the fuse canister.
9. Fix the front cover. The switch-fuse
combination is ready for operation.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Safeplus 36

Table of Contents