Hatco 120 User Manual
Hatco 120 User Manual

Hatco 120 User Manual

Sectional door operator

Advertisement

Quick Links

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER'S
MANUAL
HATO 120/200
SECTIONAL DOOR OPERATOR
USER'S MANUAL
2

Advertisement

Table of Contents
loading

Summary of Contents for Hatco 120

  • Page 1 HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL HATO 120/200 SECTIONAL DOOR OPERATOR USER’S MANUAL...
  • Page 2: Table Of Contents

    HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL OUTLINE Safety instructions ..........Description and features ........Technical specifications ........Check ..............Installation and adjustment ......... 5 Programming ............. 7. External terminal connection ......8. Maintenance ............. Troubleshooting ..........
  • Page 3: Safety Instructions

    HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL Safety instructions Carefully read and follow all safety precaution, warnings before attempting to install and use this sectional door operator, incorrect installation can lead to severe injury. • The installation should be carried out by a qualified technician....
  • Page 4: Check

    HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL Max. door size / 12m 220V~240VAC±10% 50Hz Power Input Courtesy light time 3 minutes -20°C ~ 50°C Working temperature Radio frequency 433.92MHz Transmitter type Rolling code Transmitter battery 23A 12V Battery...
  • Page 5 HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL highest point. (Note: there should be 80mm space between this horizontal line to the ceiling. If there is not enough space, please use the max. height possible to allow the header bracket to be fitted properly.
  • Page 6 HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL Step 2 • Aluminium rail (see Fig.5): insert the shuttle into the groove at the end of the rail. Be sure the release lever on the shuttle faces towards the powerhead. Slide the shuttle along the rail until it locks into the chain connector....
  • Page 7 HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL Raise and support the powerhead with a ladder and line up the tube with the centerline  marked on the door. The rail must be level. Pivot pin and R pin Fig.8...
  • Page 8: Programming

    HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL Fig.10 Steel rail Step 6 Fix the door bracket on the top edge of the door with bolts. Link the L arm to the door bracket with pin and R pin. Link the straight arm to the shuttle with pin and R pin, ensure the door arm can be moved freely.
  • Page 9 HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL 4. ’||’ is indicated on the LED display, then the learning process is finished. Up to 20 transmitters may be used. Fig.13 Erase transmitter Press and hold LEARN until ’C’ flashes on the LED display. This indicates that all the transmitters have been erased completely.
  • Page 10 HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL Fig.15 Automatic close (0~9 minutes adjustable) 1. Press and hold UP until ’─’ is indicated on the LED display. 2. Press UP to increase the auto close time, press DOWN to decrease time.
  • Page 11: External Terminal Connection

    HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL LOCK function • Press and hold SET. The LED will display number from ’1’ to ’4’, when the number ’4’ appears on the LED display, release SET. • Press UP, number ’1’ will be indicated on LED display, LOCK function enable.
  • Page 12: Maintenance

    HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL +24V +24V Phocell receiver Phocell transmitter Wall switch Fig.20 8. Maintenance • Check the door once a month. The door should be carefully checked for balance. The door must be in good working order....
  • Page 13 HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S MANUAL DISTRIBUTOR/SALESMAN Hato Polska S.C Tomasz Słodkowski – Harmeet Singh ul. Tunelowa 57 40-676 Katowice POLAND Warehouse/sales/service ul. Żeromskiego 1 41-205 Sosnowiec tel. 032/ 785-25-42 www.hato.com.pl...

This manual is also suitable for:

200

Table of Contents