Check; Installation And Adjustment - Hatco 120 User Manual

Sectional door operator
Table of Contents

Advertisement

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER'S
MANUAL
Max. door size
Power Input
Courtesy light time
Working temperature
Radio frequency
Transmitter type
Transmitter battery
Bulb
4.

Check

After receiving the product, you should make an unpack-inspection, in which you should
check whether the product was damaged. If you have any problem please contact dealer.
Wall bracket (x1) Door bracket (x1)
Aluminium rail assembly (x1) or Steel rail assembly (x1)
Transmitter (x2)
L arm (x1)
Note: If the operator is equipped with steel rail, two pieces of connecting brackets are not included.

5. Installation and adjustment

Step1
Check the door is in good working condition, manually open and close the door to make
sure the door operates smoothly and freely.
The door must be well balanced.
Check to see if there is a solid frame in the wall above the center of the door.
Close the door.
Mark the centerline of the door using a pencil, and extend the line down to the door
surface, then up the wall above the door.
Check the installation height of the operator. Slowly open garage door and observe the
highest point of door while moving. Close the door again and mark this highest point on
the wall, mark a horizontal line across the vertical centerline around 40mm above the
220V~240VAC±10% 50Hz
-20°C ~ 50°C
433.92MHz
Rolling code
23A 12V Battery
220V~240V 25 watt E14 bulb
Connecting bracket (x2)
For aluminium rail only
Straight arm (x1)
Fig.1
5
2
2
8m
/ 12m
3 minutes
Powerhead
bracket (x2)
Powerhead (x1)