LK Systems Electric Boiler-4.5 Assembly Instructions Manual

Electric boiler

Advertisement

Quick Links

LK Electric Boiler - 4,5
Design
LK Electric Boiler 4,5 kW is a wall-mounted elec-
tric boiler, intended primarily for low-temperature
heating systems, e.g. under floor heating.
LK Electric Boiler 4,5 kW is delivered as a complete
unit. The boiler is ready for use once the water and
electricity are connected.
The boiler includes:
• Thermostat
• Overheating (maximum safe temperature)
protection
• Indication power on and triggered overhea-
ting (maximum safe temperature) protection
• Control switch
• Circulation pump, Grundfos UPM3 Auto L
15-50
• Expansion vessel
• Pressure gauge
• Thermometer
• Safety valve, 2,5 bar
• Automatic air bleeding valve
• Bypass valve
The electric boiler is not fitted with a water heater,
this is installed separately.
Function/Requirements
The boiler output meets the heat requirements
for up to 90 m² of living space, depending on the
insulation and ventilation. Depending on the con-
nection the boiler can supply 1,5, 2,25, 3 or 4,5 kW.
The boiler is controlled by an in-built thermostat.
If necessary, the boiler can also be controlled by an
external thermostat, for more information please
refer to the heading "External switching/room
thermostat".
Assembly
The boiler is mounted to the wall, or in a cabinet.
The boiler dimensions 420 x 700 x 200 mm (W x H
x D) mean that it can be installed in most kitchen
cabinets.
Assembly instructions | LK Electric Boiler - 4,5
Pipe installation
Installation should be carried out according to the
applicable regulations and standards.
The boiler should be assembled indoors, moun-
ted to a wall or similar with the pipe connections
underneath.
The ambient temperature must not exceed 30°C.
The gap between the underside of the boiler and
the surface beneath it must be at least 300 mm to
enable electric cartridges to be replaced, if neces-
sary.
Hard, calciferous water is not suitable for use with
this heating system. To avoid corrosion damage
the pH value should not be too low.
The blow-off pipe from the electric boiler safety
valve flows into a drip tray in the boiler cabinet.
The installation inspection should be carried out
according to the applicable regulations on a unit
with a sealed expansion vessel, before the unit is
operated. The inspection should be conducted by a
suitably qualified person. The replacement of parts
and the expansion vessel must not occur without
a repeat inspection of the installation.
A counter torque wrench should be used during
connection to avoid damaging the internal piping.
EN.33.C.111.1804
1 (9)

Advertisement

Table of Contents
loading

Summary of Contents for LK Systems Electric Boiler-4.5

  • Page 1 Assembly instructions | LK Electric Boiler - 4,5 LK Electric Boiler - 4,5 Design LK Electric Boiler 4,5 kW is a wall-mounted elec- tric boiler, intended primarily for low-temperature heating systems, e.g. under floor heating. LK Electric Boiler 4,5 kW is delivered as a complete unit.
  • Page 2: Safety Valve

    Assembly instructions | LK Electric Boiler - 4,5 Installation - system outline When the system is filled with water it should be air-bled at the electric boiler and the manifolds. Below is a system outline. Units should always be installed according to regulations and standards. Flow - circulation pump The flow must be secured.
  • Page 3: Pipe Installation

    Pipe installation If the button is depressed for 2 sec, the pump switches to setup mode and the LEDs flash. In Circulation pump setup mode, any one of 10 curves can be selected by turning the button. When the button has been Delivery setting: Constant pressure curve 1.
  • Page 4: Electric Installation

    Assembly instructions | LK Electric Boiler - 4,5 Electric installation 1,5 kW / 230 V~ / 6,5 A Electric installation should be carried out in accor- L3 L2 L1 dance with the applicable regulations, under the supervision of an authorized electrician. The boiler must not be connected to the electrical supply before it is filled with water.
  • Page 5: Wiring Diagram

    Assembly instructions | LK Electric Boiler - 4,5 External switching/room thermostat Wiring diagram The boiler can be blocked by external equipment, 4,5 kW / 400V 3N~ / 6,5 A e.g. room thermostat with potential-free opening Feed cable: 5 x 1,5 mm² contact suitable for 230 V/10A.
  • Page 6: Alternative Connection

    Assembly instructions | LK Electric Boiler - 4,5 Operation and maintenance Alternative connection 4,5 kW / 230 V 1N~ / 19,6 A Feed cable: 3 x 4 mm² Protection fuse: 20 A °C Mount DIN-rail, 3-pole terminal block with end plate, and connect cables supplied as shown in wiring diagram below.
  • Page 7: Temperature Setting

    Assembly instructions | LK Electric Boiler - 4,5 Temperature setting Air bleeding Set the thermostat to a suitable temperature. Air may remain in the system for some time after installation, which is the why water may need to The maximum temperature for concrete floor joists be replenished.
  • Page 8: Troubleshooting

    Assembly instructions | LK Electric Boiler - 4,5 Troubleshooting Intervention in the boiler which requires the use of tools should be carried out by an authorized electrician. Begin all troubleshooting tasks by looking at the status indicators, see the Control panel section. Error Possible cause Measures...