1. INTRODUCTION NOTE This meter has been designed and tested according to CE Safety Requirements for Electronic Measuring Apparatus, IEC / EN 61010-1 and other safety standards. Follow all warnings to ensure safe operation. WARNING READ "SAFETY NOTES" (NEXT PAGE) BEFORE USING THE METER.
2. SAFETY NOTES Read the following safety information carefully before attempting to operate or service the meter. Use the meter only as specified in this manual. Otherwise, the protection provided by the meter may be impaired. Rated environmental conditions (1) Indoor Use. (2) Installation Category (3) Pollution Degree 2.
3.FEATURES Large Liquid Crystal Display (112x59mm) Back light function. Analog scale with Bar-graph for viewing. (100 bars) 10000-count LCD (high resolution) ACV Ranges: 99.99mV~800.0V 5 manual ranges controlled by rotary switch Data Hold function Low battery indication 9V power supply Best resolution of 0.01mV (10uV) Complies with CE standard EN61010-1.
Page 9
(1) Rotary switch The rotary switch selects the range for different voltages. (2) Large LCD (112x59mm) 10000-count LCD. Analog scale with Bar-graph for viewing(100 bars). (3) Red testing terminal This is the red testing terminal for AC voltage measurement. Use the red test lead to connect. (4) Black testing terminal This is the black testing terminal for AC voltage measurement.
Page 10
(7) Handle Easy-to-carry handle that doubles as a convenient stand. Pull to rotate Rotate the handle at different angles The handle functions as a stand (8) Holster Rugged holster for protection. - 8 -...
7. MEASUREMENT Before proceeding with measurement , read the safety notes. AC Voltage measurement (1) Insert the Red test lead to the Red testing terminal and insert the black test lead to the Black testing terminal. (2) Select the appropriate range for ACV measurement.
8. MAINTENANCE Battery replacement When the low battery warning symbol appears, replace with new batteries as follows (1) Disconnect the test leads from the instrument and turn off the power. (2) Unscrew the battery cover and replace with new batteries. (3) Close the battery cover and screw.
Page 13
Due to our policy of constant improvement and development, we reserve the right to change specifications without notice. - Is for measurements performed at the source of the low voltage installation. - Is for measurements performed in the building installation. - Is for measurement performed on circuits directly connected to the low voltage installation.
Need help?
Do you have a question about the ST-2001 and is the answer not in the manual?
Questions and answers