Where To Go Next - Cisco Catalyst 3550 Hardware Installation Manual

Multilayer switch
Hide thumbs Also See for Catalyst 3550:
Table of Contents

Advertisement

Chapter 2
Installing and Starting the Switch
Figure 2-14 Connecting to the Console Port
10 0- 24
0V ~
5- 3A
50 /6 0H
z
C O N S O
L E
RJ-45
console
Rollover
port
cable
Step 3
Step 4
Step 5

Where to Go Next

78-11358-01
Attach the supplied RJ-45-to-DB-9 female DTE adapter to a PC, or attach an
appropriate adapter to the terminal.
Insert the other end of the supplied rollover cable in the attached adapter.
Boot the terminal-emulation program if you are using a PC or terminal.
If the default configuration is satisfactory, the switch does not need further
configuration. You can use any of these management options to change the default
configuration:
Start the Cluster Management Suite, as described in the Catalyst 3550
Multilayer Switch Software Configuration Guide, and configure the switch as
a member of a cluster or as an individual switch. Refer to the release notes on
Cisco.com for the most current browser requirements.
Use the CLI to configure the switch from the console. Refer to the
Catalyst 3550 Multilayer Switch Software Configuration Guide and the
Catalyst 3550 Multilayer Switch Command Reference for information on
using the CLI with a Catalyst 3550 switch.
Start an SNMP application such as the CiscoView application.
Catalyst 3550 Multilayer Switch Hardware Installation Guide

Where to Go Next

2-23

Advertisement

Table of Contents
loading

Table of Contents