Installing The Gbic Modules - Cisco Catalyst 3550 Hardware Installation Manual

Multilayer switch
Hide thumbs Also See for Catalyst 3550:
Table of Contents

Advertisement

Chapter 2
Installing and Starting the Switch

Installing the GBIC Modules

Note
78-11358-01
Figure
2-7,
Figure
2-8, and
a GBIC module slot on the switch. For detailed instructions on installing,
removing, and cabling the GBICs (1000BASE-X module, 1000BASE-T module,
or the GigaStack module), refer to your GBIC documentation.
GBIC modules are not factory-installed on this switch, but you can order
GBIC modules separately.
Figure 2-7
Installing a 1000BASE-X GBIC Module in the Switch
6
7
8
9
1000BASE-X
GBIC module
Catalyst 3550 Multilayer Switch Hardware Installation Guide
Figure 2-9
show how a GBIC module is inserted into
Metal flap door
C a ta ly s t
3 5 5 0
10
11
12
GBIC module slot

Installing the GBIC Modules

2-15

Advertisement

Table of Contents
loading

Table of Contents