Unit 3 Installation; Height Installation - Genway C5-IP-OS-02 User Manual

Outdoor station
Table of Contents

Advertisement

Unit 3 Installation

3.1 Height Installation

Notes for Installation :
1. The depth of the groove should be well measured. Too much space
between the wall and the embedded is prohibited.
2. Do not install on the wall that have much contact with rain, moisture or
dust. And keep away from objects of high temperature and strong
corrosivity.
Ground
4

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the C5-IP-OS-02 and is the answer not in the manual?

Table of Contents

Save PDF