Honeywell PRO32E1PS Assembly And Installation Instructions Manual page 8

Table of Contents

Advertisement

11. Connect the AC power inlet and LED indicator cable to the power supply by pushing and inserting
the cable connector to the pin connector CN1:
AC Power Inlet and LED Indicator
Cable connecting to CN1
Figure 6: AC Power Inlet and LED Indicator Cable Assembly Connecting to CN1 Pin Connector
Warning: Do not connect power at this time!
12. Connect the 12VDC output and battery output cable to the power supply by pushing and inserting
the cable connector to the pin connector CN2:
12VDC Power and Battery Cable
Connecting to CN2
Figure 7: 12VDC Power and Battery Cable Assembly Connecting to CN2 Pin Connector
Document 800-08279, Revision A
February 2011
CN1 Pin
Connector
CN2 Pin
Connector
8 of 12
© Honeywell International. All rights reserved.
Installation Instructions

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pw6k2e2ps

Table of Contents