Commissioning the system with the commissioning...
Fig. 23
HO2C
Fig. 24
HO2B
Solar thermal system
A
DHW cylinder
B
Heat generator (segments
C
marised for compact appliances)
Low loss header
D
Heating circuits and ventilation system (if connec-
E
ted to the control unit)
Further settings for the system components
Further settings can be made in relation to individual
system components (fine tuning).
1. Tap the required system component.
The setting options for that system component
appear on the display.
Note
In relation to the heating circuits for example, the
heating circuit type can be set (e.g. underfloor
heating circuit or swimming pool).
For the low loss header, there are no setting
options.
and
are sum-
B
C
Commissioning, inspection, maintenance
4. Compare the device list with the system compo-
nents actually connected.
If any components were not detected, these can be
added later via the relevant parameters.
5. Illustration of system components (if available)
Accept the device list with "Next" or "
A system scheme according to the detected com-
ponents appears on the display.
6. Confirm the system scheme with "Next" or "
Add or remove system components with "Change"
or " ".
If there is no heating circuit without mixer in the
■
system, it must be removed manually.
■
A second DHW cylinder must be added man-
ually.
7. Confirm the system scheme with "Next" or "
2. When all the settings have been entered, tap
"Next" or "
".
The display shows "Commissioning terminated"
and the selection "Results", "Components" and
"Settings" appears.
Note
If no settings have been made, another note
appears regarding fine-tuning.
Commissioning is terminated with "No" or " ".
(cont.)
".
".
".
33