THE INSTALLATION INSTRUCTIONS IN THIS 2. INSTALLING THE HEATER MANUAL APPLY TO THE Positioning the Heater NECTRE BIG BAKERS OVEN First review the necessary clearances specified below before considering where to position the heater. Also check the practicability of installing the flue system in relation to any obstructing roof beams before positioning the heater.
Page 3
For example: material no less than 15mm thick and with a thermal Side wall clearance for the Big Bakers Oven is 325 mm. conductivity not greater than 0.33W/m ºK, eg. compressed cement sheet. The floor protector may be laid directly on the A 12mm gapped shield on the wall with a factor of 0.40.
6. INSTALLING FIRE BRICKS 4. INSTALLING THE BY-PASS DAMPER Before installing the flue, the by-pass damper handle must be The heater comes with 4 fire bricks (230 mm x 115 mm x 38 fitted. The handle is supplied inside the firebox. mm) and a 480 mm long brick retainer as well as two triangular bricks (50 x 70 x 250 mm) for the front.
Page 5
8. INSTALLING BAFFLE PLATE 10. TECHNICAL DRAWINGS The heater comes with a 250 (d) x 325 (w) x 6 (h) mm baffle Front view:- plate. This rests on the two lugs welded to the inside front of the firebox and on the brick retainer at the back of the heater.