RFB 119 Series Floor Box
I N S T L L T I O N I N S T R U C T I O N S
Installation Instruction No.: 1 003 189R1 – Updated pril 2011
Products Covered: Floor Box Cat. Nos.: RFB9, RFB11,
Floor Box Covers: RFB119CTC, RFB119BTC
Floor Box Device Plates: RFB119 (suffix)
C UTION: Do not operate tile stripper or resurfacing equipment over top of covers. This may result in damage to the surface finish
of the product.
C UTION: When used in bare concrete or terrazzo floors, use part number: RFB119-P N (Sold separately).
Step 1 Locate and position box in accordance to floor
plans or blueprint.
[178mm]
6 5/16"
[161mm]
12 5/8"
[321mm]
Step 3 Remove mudcap and attach conduit.
14"
[356mm]
7"
Legrand/Wiremold electrical systems conform to and should be properly
grounded in compliance with requirements of the current National
Electrical Code or codes administered by local authorities.
ll electrical products may present a possible shock or fire
hazard if improperly installed or used. Legrand/Wiremold electrical
products may bear the mark of a Nationally Recognized Testing
Laboratory (NRTL) and should be installed in conformance with current
local and/or the National Electrical Code.
IMPORT NT: Please read all instructions
before beginning.
Step 2 Level & anchor box. Top of box must be flush with
concrete pour. Use screws, nails, or wire to prevent
box from floating during pour.
C UTION: Box has no post pour adjustment.
Step 4 Reinstall mudcap.
NOTE: For use in bare concrete or terrazzo floors, replace
mudcap with part number: RFB119-P N. (Sold
separately.) (See Step 19.)
Need help?
Do you have a question about the RFB9 and is the answer not in the manual?
Questions and answers