Fig. 27
Boiler block on pallet (as delivered)
1
Pallet
2
Securing straps
5.4
Installation steps for disassembled
and assembled delivery
Carry out the steps detailed in this chapter for deliveries
in sections or as block. Where there are different
procedures for installation between disassembled and
assembled delivery, this noted in the manual.
5.4.1
Fitting adjustable feet
Use the adjustable feet (packaging
page 8) to adjust the boiler to a horizontal position to
prevent air from collecting in the boiler.
B Tip the boiler or support it on a wood block.
B Screw the adjustable feet 0.20 – 0.40 inches (5 -
10 mm).
1
Fig. 28
Fitting adjustable feet
1
Front feet
2
Wood block
B Gently set the boiler down.
6 720 648 032-27.1T
Chapter 2.6,
2
6 720 648 032-28.1T
5.4.2
Insert the flue gas baffle plates
B Remove the corrugated cardboad packaging when the
block is supplied ready assembled.
-or-
B Remove the flue gas baffles plates from the carton
containing the small iron fillings when the boiler is
supplied in sections.
The cast lugs should point towards the
center of the boiler
B Install the flue gas baffle plates in accordance with
the following table into the central second flue gas
pass.
Fig. 29
Flue gas baffle plates into the second flue gas
pass (here: centrally)
The cast lugs should point outwards.
B Install flue gas baffle plates in accordance with the
following table into the third flue gas pass.
Fig. 30
Flue gas baffle plates into the third flue gas pass
Boiler block assembly | 25
6 720 648 032-29.1T
6 720 648 032-30.1T
6 720 648 162 (2011/08)