UTICA BOILERS MAH-125 Installation, Operation And Maintenance Manual page 17

Condensing wall mounted gas fired boiler
Table of Contents

Advertisement

4.2 Service and Combustible Clearances
Left Side View
of Boiler
CLEARANCES REQUIRED FOR
CLOSET INSTALLATION
1 3/4 in
[45mm]
Closet Installation
0 in /0 mm between Back of Unit and wall
4 - LOCATING BOILER
125 & 150
165 & 205
13 9/16 in
211/2 in
[345 mm]
[571.5 mm]
13.58 in /
345.00 mm
30 in
[763 mm]
Minimum Clearance
17 3/4 in. [450mm ]
From Front of Boiler
Back
Top View
1 3/4 in
[45mm]
1 9/16 in
[40mm]
8 5/8 in [220 mm]
17 3/4 in
1 3/4 in
[45mm]
[450mm]
9 13/16 in [250 mm]
CLEARANCES FOR
COMBUSTIBLES
1
3/4 in
[45 mm]
Front View of
Boiler
13
Front View of
Boiler
1 3/4 in
[45mm]
17 3/4 in
1
3/4 in
[45 mm]
[450 mm]
240011941 REV B, [03/31/2018]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mah-165Mac-205Mac-150

Table of Contents