Three-phase connection:
Connect the earth, neutral and phase wires as
42
shown in example "AC" and "N AC" in the
figure.
When the installation is completed, check:
• that the drum is empty.
• that the machine operates by turning on the
mains switch, starting the machine and using
RAPID ADVANCE to reach the spin cycle (see
operations manual).
Installation
42
3AC
3AC
3N AC
3N AC
5
alt.
��
��
��
6525
54
alt.
�
��
��
��
6526
29