Thank you for purchasing this Safco Product.
We hope that you will enjoy using it.
SHOULD YOU NEED ASSISTANCE WITH YOUR PRODUCT,
PLEASE DO NOT RETURN YOUR
PRODUCT TO THE STORE!
For all questions, concerns or assistance, please call
Safco Consumer Hot Line
1-800-664-0042
available Monday-Friday 8:00 AM to 4:30 PM (Central Time)
(English-speaking operators)
Sort and count your parts!
LETTER
CODE
A
Lower Post (with leveler)
B
Upper Post (with plastic cap)
C
Half-Sleeve
D
Shelf
1
To build the four corner
posts, screw the A Lower
Posts (with levelers) onto
the B Upper Posts (with
plastic caps). Hand
tighten.
5276-37: 1 of 2; Rev. 1; 06/09
Wire Shelving Unit
ASSEMBLY INSTRUCTIONS
PARTS LIST
DESCRIPTION
QTY.
4
4
32
4
Safco Products Company, New Hope, MN 55428
D
PART NO.
5276-01BL
5276-02BL
5280-05BL
5276-03BL
2
Decide where you want to
B
mount the BOTTOM SHELF
(no more than 12" from the
floor). At this position on
each post, place two C
Half-Sleeves around the
post, with the LARGE ends
of the sleeves toward the
BOTTOM of the post and the
ridges inside the sleeves
fitting into the grooves in the
post. Press the two halves
A
until they snap together.
5276
MODEL
NUMBER
C
B
C
A
RIDGE
GROOVE
D
SMALL
END
LARGE
END