Installing The Main Landing Gear - Seagull SEA53B Assembly Manual

Yak 54 91 arf
Table of Contents

Advertisement

YAK 54.
Fuel pick-up
tube.
Blow through one of the lines to ensure
the fuel lines have not become kinked inside
the fuel tank compartment. Air should flow
through easily.
WHEEL AND WHEEL PANTS.
1) Assemble and mounting the wheel pants
as shown in the following pictures.
2) Follow diagram below for wheel pant
installation:
7mm.
Lite-Plywood
wheel collar.
block.
Axle.
Washer.
8
Vent tube.
Fuel fill tube.
14mm.
M3.
wheel.
Instruction Manual.
Washer.
nut.
wheel Pant.
Lite-Plywood
Landing Gear.
C/A glue.
Locker glue.
3) A drop of C/A glue on the wheel collar
screws will help keep them from coming lose
during operation.
Repeat the process for the other wheel.

INSTALLING THE MAIN LANDING GEAR.

1) The blind nuts for securing the landing
gear are already mounted inside the fuselage.
wheel.
wheel collar.
Axle.
M3.
block.
wheel Pant.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents