Installing The Stopper Assembly; Engine Mount - Seagull SEA53B Assembly Manual

Yak 54 91 arf
Table of Contents

Advertisement

YAK 54.
M3 LOCK NUT
Aluminum Washer
CONTROL HORN M3
Fuselage.
Aluminum Washer
M3 LOCK NUT
M3 LOCK NUT
.
Aluminum Washer
Fuselage.
20mm

ENGINE MOUNT.

See pictures below:
4x30mm.
6
.
.
.
.
.
CONTROL HORN M3
Rudder.
.
Hinge.
Rudder control horn.
Instruction Manual.
Mark and drill 4 holes for engine mount.
Diameter =5.5mm.
Thread locker glue.

INSTALLING THE STOPPER ASSEMBLY.

1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon tubes
leaving 1/2" protruding from the rear of the
stopper. This will be the fuel pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other end
to the nylon pick up tube.
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents