H3C S5820X Series Configuration Manual page 192

Layer 3 - ip services
Hide thumbs Also See for S5820X Series:
Table of Contents

Advertisement

# Create the interface tunnel 2.
[SwitchB] interface tunnel 2
# Configure an IPv4 address for the interface tunnel 2.
[SwitchB-Tunnel2] ip address 30.1.2.2 255.255.255.0
# Configure the tunnel encapsulation mode.
[SwitchB-Tunnel2] tunnel-protocol ipv4-ipv6
# Configure the source address for the interface tunnel 2 (IP address of VLAN-interface 101).
[SwitchB-Tunnel2] source 2002::2:1
# Configure the destination address for the interface tunnel 2 (IP address of VLAN-interface 101 of
Switch A).
[SwitchB-Tunnel2] destination 2002::1:1
[SwitchB-Tunnel2] quit
# Create service loopback group 1 to support the tunnel service.
[SwitchB] service-loopback group 1 type tunnel
# Add GigabitEthernet 1/0/3 to service loopback group 1.
[SwitchB] interface GigabitEthernet 1/0/3
[SwitchB-GigabitEthernet1/0/3] undo stp enable
[SwitchB-GigabitEthernet1/0/3] port service-loopback group 1
[SwitchB-GigabitEthernet1/0/3] quit
# Reference service loopback group 1 on the tunnel.
[SwitchB] interface tunnel 2
[SwitchB-Tunnel2] service-loopback-group 1
[SwitchB-Tunnel2] quit
# Configure a static route from Switch B through the interface tunnel 2 to Group 1.
[SwitchB] ip route-static 30.1.1.0 255.255.255.0 tunnel 2
Configuration verification
After the configuration, display the status of the tunnel interfaces on Switch A and Switch B,
respectively.
<SwitchA> display interface tunnel 1
Tunnel1 current state: UP
Line protocol current state: UP
Description: Tunnel1 Interface
The Maximum Transmit Unit is 1460
Internet Address is 30.1.2.1/24 Primary
Encapsulation is TUNNEL, service-loopback-group ID is 1.
Tunnel source 2002::0001:0001, destination 2002::0002:0001
Tunnel protocol/transport IP/IPv6
Last clearing of counters: Never
Last 300 seconds input: 0 bytes/sec, 0 packets/sec
Last 300 seconds output: 0 bytes/sec, 0 packets/sec
152 packets input, 9728 bytes
0 input error
168 packets output, 10752 bytes
0 output error
<SwitchB> display interface tunnel 2
Tunnel2 current state: UP
Line protocol current state: UP
17-31

Advertisement

Table of Contents
loading

This manual is also suitable for:

S5800 series

Table of Contents