ABB AutoLink Instruction Book

15kv, 27kv, 38kv
Hide thumbs Also See for AutoLink:

Advertisement

Quick Links

TEHI95094 - Rev. 2
AutoLink
15kV, 27kV, 38kV
Instruction Book


Advertisement

Table of Contents
loading

Summary of Contents for ABB AutoLink

  • Page 1 TEHI95094 - Rev. 2 AutoLink 15kV, 27kV, 38kV Instruction Book ...
  • Page 2 ABB investigate such ways. Anyone using service procedures or tools, whether or not recommended by ABB, must satisfy himself thoroughly that neither personal safety nor equipment safety will be jeopardized by the service method or tools selected.
  • Page 3: Table Of Contents

    Description ..............................5 Installation ..............................5 General ..............................5 Installation and service conditions ..................... 5 Initial Setting or Previous Setting Modification Instructions ............6 Dip-Switch Configuration ........................7 AutoLink Repositioning ........................8 Commissioning ............................11 General procedures ........................... 11 Maintenance ..............................11...
  • Page 4: Introduction

    Make sure that all materials described in the shipping note are included in the supply. If any damage or irregularity is seen in the supplied product after unboxing, notify ABB (directly or through the agent or distributor) as soon as possible within five days of receipt.
  • Page 5: Storage

    The AutoLink Electronic Sectionalizer is a protection device that operates at a permanent fault in the distribution line. It must be used together with a upstream recloser. Please take note that the AutoLink is not a fuse tripping device, therefore it cannot be used as a protection device by itself.
  • Page 6: Initial Setting Or Previous Setting Modification Instructions

    TEHI95094 – Rev. 2 6/ 12 6.3 Initial Setting or Previous Setting Modification Instructions Remove the top cap (Fig. 1 A) using a 34mm fork spanner holding the tube with the hand (Fig. 1 B). Check condition of O-ring (Fig. 2 E), and replace it if necessary, applying grease on it.
  • Page 7: Dip-Switch Configuration

    6.4 Dip-Switch Configuration Once the calibration current and counts are set, cover the dip-switch with silicon grease (Fig. 3), supplied with AutoLink. Check the condition of the O-Ring (Fig. 2 E) and apply silicon grease (Fig. 4 F) both inside...
  • Page 8: Autolink Repositioning

    Place the cap, holding the tube with the hand, and tighten it using a 34 mm fork spanner (torque between 8 and 10 Nm) without damaging the O-Ring (Fig. 5). 6.5 AutoLink Repositioning Push the interlocking bolt (Fig. 6) until blocked (it will rotate freely). Do not strike the bolt, nor use any type of tool to reset.
  • Page 9 TEHI95094 – Rev. 2 9/ 12 Turn the tripping pin 90°, until the lower contact is firmly blocked (Fig. 8) Place the pole in the tube inferior eyelet (Fig. 9) and position in the cutout-base.
  • Page 10 TEHI95094 – Rev. 2 10/ 12 Withdraw the pole and place it in the tube’s superior eyelet (Fig. 10). Push it until it remains in closing position.
  • Page 11: Commissioning

    - Check that the mobile lever and the lower support of the AutoLink move easily at the joint. Clean and lubricate the joint surfaces of both pieces.
  • Page 12: Tehi95094 – Rev. 2

    TEHI95094 – Rev. 2 12/ 12  ©Copyright 2013 ABB, All rights reserved Document Title AutoLink Instruction Book Document No. Date & Rev. Ind. No. of Pages Page TEHI95094-EN Sep 2013 - Rev 2...

Table of Contents