Download Print this page

Installation; Installing Hood - Viking Range DCH3642 Installation Manual

Built-in interior power 12 inch h. chimney hoods

Advertisement

INSTALLATION

Plan where and how the ductwork will be located. Install
proper-sized duct work, transition(s), elbow(s) and roof or
wall cap.
Dimensions for the most common installations are shown
ABOVE.
Adjust your measurements for various heights of ceilings,
soffits, cabinets, or cooktops.

INSTALLING HOOD

Center hood over location and hold it against
bottom of soffit or flue. Secure hood to wall with
mounting screws.
Use additional mounting screws and wall anchors if
necessary.
NOTE: BECAUSE OF THE WEIGHT OF THE
HOOD - MAKE SURE THAT THE SCREWS ARE
DRIVEN INTO THE SOFFIT FRAMING AND NOT
JUST THE DRYWALL.
INSTALLING DUCT
1. Use 7" round ductwork. Run ductwork from roof cap or wall cap, to the installation location. For best
performance, use the straightest possible duct run and the fewest number of elbows. Tape all joints.
2. Run 120 VAC electrical power cable from service panel to installation location.
3. Connect transition provided to the damper on top of hood. Tape all joints.
4. Connect the same transition to the duct extending from the roof/wall cap. Tape all joints.
5. Remove wire box cover. Remove a knockout from the wiring box. Feed 6" of power cable through opening and
attach cable to wiring box with appropriate connector.
6. Wire black to black, white to white, and green or bare wire beneath green ground screw. Replace wire box cover.
7. If using a duct cover, from inside the hood, attach duct cover to top of hood using the screws provided with duct
cover.
Use duct tape to make all joints secure and air tight. In some installations, it is easier to attach transition to plate
before attaching plate to hood.
Roof Cap
7" Round
Duct
Top Mounting Holes
Inside Top of Hood
Mounting Holes
Inside Back of Hood
4

Advertisement

loading

This manual is also suitable for:

Dch3042