DM17-01.01.08en
Light Commercial R410A on-off
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
installation hook.
Locate the air conditioner firmly by wrenching the nuts after having adjusted the body's position well.
3.2.5 Install the panel
Remove the grille
Remove the 4 corner covers.
138