Clearances; Tools & Safety Gears Required - LG RESU 10H DLT Product Manual

9.8kwh battery pack
Table of Contents

Advertisement

3.1.4 Clearance (TBD)
3.1.5 Tools & Safety gears required
 Tools
The following tools are required to install the battery pack :
Precision screwdriver
Drill
(Min. Diameter 10mm, 0.4'')
 Recommended clearances (>12'') on
the left, right, top and bottom of the
product is shown in the figure for the
proper ventilation and installer
convenience.
M6 Torque wrench
Pencil or Marker
3. Installation
Inclinometer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evespbo0100a0

Table of Contents