Insulation Tests; Mechanical Tests - ABB REM 610 Product Manual

Motor protection relay
Hide thumbs Also See for REM 610:
Table of Contents

Advertisement

Technical data (cont´d)
Motor Protection Relay
Table 13: Electromagnetic compatibility tests
Voltage dips and short interruptions
Electromagnetic emission tests
Conducted, RF-emission (Mains terminal)
Radiated RF-emission
CE approval
Table 14: Standard tests

Insulation tests

Dielectric tests
Test voltage
Impulse voltage test
Test voltage
Insulation resistance measurements
Isolation resistance

Mechanical tests

Vibration tests (sinusoidal)
Shock and bump test
Table 15: Data communication
Rear interface, connector X5.3 or X5.5
Fibre-optic or RS-485 connection
SPA bus, IEC 60870-5-103 or Modbus protocol
9.6 or 4.8 kbps (additionally 2.4, 1.2 or 0.3 kbps for Modbus)
Front interface
Optical connection (infrared): wirelessly or via the front communication cable (1MRS050698)
SPA bus protocol
9.6 or 4.8 kbps (9.6 kbps with front communication cable)
According to the IEC 61000-4-11
30%/10 ms
60%/100 ms
60%/1000 ms
>95%/5000 ms
According to the EN 55011
EN 55011, class A, IEC 60255-25
EN 55011, class A, IEC 60255-25
Complies with the EMC directive
89/336/EEC and the LV directive
73/23/EEC
According to the IEC 60255-5
2 kV, 50 Hz, 1 min
According to the IEC 60255-5
5 kV, unipolar impulses, waveform
1.2/50 µs, source energy 0.5 J
According to the IEC 60255-5
>100 MΩ, 500 V dc
According to the IEC 60255-21-1, class I
According to the IEC 60255-21-2, class I
REM 610
1MRS 755121
9

Advertisement

Table of Contents
loading

Table of Contents