d. Using a T-30 Torx screwdriver, tighten the nuts until they stop.
9.
If removed, do the following:
a. Install the air baffle.
b. Install the processor mezzanine tray.
c. Install the 2P pass-through performance board.
10. Install the access panel.
11. Install the server into the rack.
12. Connect each power cord to the server.
46
Removal and replacement procedures