Download Print this page

Hardware Installation - Grandstream Networks GWN7600LR Quick Installation Manual

Enterprise 802.11ac wave-2 outdoor long range wifi access point
Hide thumbs Also See for GWN7600LR:

Advertisement

HARDWARE INSTALLATION

GWN7600LR can be mounted horizontally or vertically on a metal bar.
Please refer to the following steps for the appropriate installation.
Vertical Mounting
1. Prepare the Cover Bracket by inserting the 4 screws (PM8) into corresponding holes.
2. Attach the Cover Bracket with screws on the vertical Mounting Bolt where GWN7600LR
will be installed.
3. Assemble the Base Bracket with the Cover Bracket using provided locknuts and screws
(PM8).
1
4. Connect the Ethernet cable (RJ45) to the correct ports of your GWN7600LR.
5. Align the GWN7600LR with the Base Bracket and pull it down to the right position.
6. Install the 2x Assembled screws to fix GWN7600LR on the Mounting Bolt.
4
3
2
5
~3~
Horizontal Mounting
1. Prepare the Cover Bracket by inserting the 4 screws (PM8) into corresponding holes.
2. Attach the Cover Bracket with screws on the horizontal Mounting Bolt where GWN7600LR
will be installed.
3. Assemble the Base Bracket with the Cover Bracket using provided locknuts and screws
(PM8).
1
4. Connect the Ethernet cable (RJ45) to the correct ports of your GWN7600LR.
5. Align the GWN7600LR with the Base Bracket and pull it down to the right position.
6. Install the 2x Assembled screws to fix GWN7600LR on the Mounting Bolt.
4
2
5
~4~
3

Advertisement

loading