System Charge For Various Matched Systems; Footnotes; Charging Procedures - York YHE24B21S Technical Manual

Lx series split system heat pumps 14 seer – r-410a – 1 phase 1.5 thru 5 nominal tons
Hide thumbs Also See for YHE24B21S:
Table of Contents

Advertisement

5455359-YTG-A-1217

SYSTEM CHARGE FOR VARIOUS MATCHED SYSTEMS

Outdoor Unit
1,2
Required TXV
Defrost Jumper Pin Setting
3,4,5
Indoor Unit
AP18B
AP24B
AP30B
AP36B
AP36C
AP37C
AP42C
AP48(C,D)
AP60(C,D)
AE18B
AE24B
AE30B
AE36(B,C)
AE42C
AE48(C,D)
AE60C
AE60D
AVC18B
AVC24B
AVC30B
AVC36(B,C)
AVC42C
AVC48(C,D)
AVC60C
AVC60D
CF/CM/CU18(A,B)
CF/CM/CU24(A,B)
CF/CM/CU30(A,B,C)
CF/CM/CU36(A,B,C)
CF/CM/CU42(B,C,D)
CF/CM/CU48(C,D)
CF/CM/CU60(C,D)
CF/CM64D
Some of the combinations shown in the above System Charge table require Advanced Main Air Circulating Fan indoor product. For approved coil
only matches, please see the "COOLING CAPACITY - Upflow, Downflow & Horizontal Furnaces and Coils" table.

FOOTNOTES:

1. For applications requiring a TXV, use S1-1TVM*** series kit.
2. A TXV kit must be used with these indoor units to obtain system performance.
3. Systems matched with furnaces or air handlers not equipped with blower-off delays may require blower Time Delay Kit S1-2FD06700224.
4. CF coils cannot be used in horizontal applications.
5. Charge adders shown above do not indicate that coils are rated for every application. Refer to Performance Data Tables for actual performance for specified
system matches. Obtain certified system ratings from www.ahridirectory.org.

CHARGING PROCEDURES:

1. Check the Factory Unit Charge listed on the unit nameplate to verify the refrigerant charge for the outdoor unit, the smallest matched indoor unit, and the 15 feet of
interconnecting lineset.
2. Verify the indoor metering device and additional charge required for the specific matched indoor unit in the system using the above table.
3. Add additional charge for the amount of interconnecting lineset greater than 15 feet at the rate specified in the Physical and Electrical Table.
4. For installations requiring additional charge, weigh in refrigerant for the specific matching indoor unit and actual lineset length.
5. Once the charge adders for matched indoor unit and for lineset have been weighed in, verify the system operation against the temperatures and pressures in the
Charging Chart for the outdoor unit. Locate Charging Charts on the outdoor unit and also in the Service Data Application Guide on www.upgnet.com. Follow the
Subcool or the Superheat charging procedure in the Installation Manual according to the type of indoor metering device in the system, and allow ten minutes after
each charge adjustment for the system operation to stabilize. Record the charge adjustment made to match the Charging Chart.
6. Permanently mark the unit nameplate with the total system charge. Total System Charge = Base Charge (as shipped) + charge adder for matched indoor unit +
charge adder for actual lineset length +/- adjustments to match the charging chart.
4
YHE18B21S YHE24B21S YHE30B21S YHE35B21S YHE36B21H YHE42B21H YHE48B22S YHE60B22S
BA1
BA1
BB1 or BE1
2
2
0
7
0
9
0
7
0
9
0
7
0
9
0
7
0
9
BE1
BF1
2
3
3
Additional Charge, oz
0
0
8
0
0
0
3
7
8
8
0
0
0
3
7
8
8
0
0
3
8
7
8
BF1
BC1
BG1
2
4
0
0
0
1
8
0
0
0
1
8
0
0
1
8
Johnson Controls Unitary Products
2
2
2
2