Mounting The Appliance On The Bracket - Frico Soloclim SC17 Original Instructions Manual

Table of Contents

Advertisement

Installation
Once installation of the grilles is complete check their
opening (towards the inside of the duct for the air inlet
grid "IN" and towards the outside of the duct for the air
outlet grid "OUT"). Remember that the grilles open when
the external air flow is activated, to allow the cooling and
heating functions to be operated. The conditioner must be
activated for cooling or heating in order to test them.

Mounting the appliance on the bracket

After checking that the bracket is anchored to the wall and
that all necessary electrical connections and condensation
drain predispositions have been made, you can mount the
conditioner. Lift it by the sides of the bottom base until
the bracket fits on all of the right spots on the appliance.
In order to ease the operation, slightly tilt the appliance
towards you.
Direct electrical connections (disconnecting the power supply
cable) and the anchoring of the condensation drain must be
1
Bracket
2
Bracket anchoring points
3
Anti-lifting bracket
Soloclim
A
Junction line
B
Hook
C
Flap in vertical position
carried out after having spaced the appliance from the wall
using a wooden wedge or any other similar object.
Once the work is done, check that there are no openings on
the back of the appliance, especially where the air ducts are
connected. The machine can be secured to the wall with a
dedicated anti-lifting bracket in order to improve installation
safety,
this is located on the rear part of the machine. The drilling
position is reported on the installation template.
GB
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Soloclim sc22Soloclimsc23dci

Table of Contents